Glossary
Industrial energy glossary
The market, technical and regulatory terms you need for solar and battery storage decisions — explained in plain language, from an EPC contractor's perspective. The list is continuously growing.
aFRR
Automatic frequency restoration reserve — a MAVIR system service in which participation is mandatory for solar generators above 50 kVA.
Aggregator
The market participant that pools the aFRR obligations of generators below 5 MW and manages them toward MAVIR.
BTM (Behind-the-Meter)
An on-site system “behind” the consumption meter that generates for self-consumption and may not feed back into the grid.
C-rate
The charge/discharge speed relative to capacity: 0.5C = a full cycle in 2 hours, 1C = in 1 hour.
Clipping (inverter clipping)
The part of a solar array’s DC output that the inverter cannot convert above its rated AC power and is therefore lost — unless battery storage absorbs it.
DAM (Day-Ahead Market)
The HUPX day-ahead market, where hourly/15-minute prices for the next day are set; the settlement basis for spot contracts.
DC/AC ratio
The quotient of a solar array’s DC peak power (kWp) and the inverter’s AC power (kW); the industrial standard is 1.2–1.3.
GBER
The EU General Block Exemption Regulation, which sets the maximum intensity of state aid — for battery storage, 50% for small enterprises.
HMKE
Household-scale small power plant — the connection category below 50 kVA, with a simplified notification to the distribution system operator.
HUPX
The Hungarian organized power exchange; day-ahead (DAM) prices change every 15 minutes and provide the settlement basis for spot-price industrial contracts.
Time-series settlement
Settlement for industrial consumers based on 15-minute metering; structured as basic charge + capacity charge + volumetric charge + reactive charge.
KÁT levy
The cost of the mandatory feed-in support for renewable generators, borne by every consumer in proportion to the kWh drawn, as a charge that changes monthly.
Contracted capacity
The maximum power (kW) contracted at the grid connection, on which a fixed annual capacity charge is payable — reducing it with a BESS is a saving.
Self-consumption rate
The share of solar generation used locally at the site; typically 80–95% for industrial plants.
Peak shaving
Battery storage smooths the peak load, reducing the peak power drawn from the grid — and with it the contracted capacity charge.
Profile-based settlement
Settlement for smaller consumers based on standard load profiles, with no capacity charge and higher volumetric tariff rates.
RTE (Round-Trip Efficiency)
The round-trip efficiency of battery storage: the share of the charged energy that can be discharged, typically 86–92% for modern industrial systems.
SCTE
A small power plant in the 50 kVA – 0.5 MW band; requires a MEKH notification and a grid connection agreement.
SOC (State of Charge)
The current charge level of battery storage in percent; daily cycles typically use a 10–90% range.
Spread (price difference)
The difference between the highest and lowest electricity price within a day; the source of battery storage arbitrage profit.
TAO tax allowance (22/H. §)
The energy efficiency allowance of the corporate tax, which makes a significant part of a BESS/PV investment deductible over 6 years.
Reverse power
Power flowing back toward the grid, which occurs when solar generates more than the site’s instantaneous consumption.