What permits are required for an industrial solar system?
The obligations fall into four pillars: the distribution side (grid connection), building, MEKH licensing and MAVIR accreditation. Below 50 kVA, when connected to the grid, the system qualifies as a household-scale small power plant, and a notification to the distribution system operator is sufficient. Between 50 kVA and 0.5 MW, a technical-economic information document (MGT) and a connection agreement (CST) with the distribution system operator are required, and the rules of electricity-industry building permitting must be applied; a MEKH license is not required in this band. Between 0.5 MW and 5 MW, these are joined by a MEKH consolidated small power plant license or a self-supply generation license. Above 5 MW, the system falls into category C, where aFRR capability also becomes mandatory, and above 50 MW a generation operating license is required. Island operation is a separate case: if the system does not feed into a utility network, then up to 0.5 MW no connection, building or MEKH licensing obligation arises. ICP carries out the entire procedure, from classification to the occupancy permit.
Related pages
More questions on this topic
Have a question about your own site? We provide a free energy assessment and simulation.
Free assessment